|
#
|
ITEM
|
DELL
MAKE
(M/s Electro Photo)
|
HCL
MAKE
(M/s HCL)
|
HP
MAKE
(M/s Spectra)
|
ACER
MAKE
(M/s ACER)
|
LENOVO
MAKE
(M/s Fore Solutions)
|
|
1.
|
2nd
Generation Intel Core i3-2100 Processor with Intel 6 series
Chipset with Windows 7 Prof. Operating System
Detailed specification as per Annexure I
|
31750/-
(Optiplex 790)
|
27500/-
(Infiniti MA 380)
|
31750/-
(HP Compaq 6200 Pro)
|
27500/-
(Veriton M200-H61)
|
29975/-
(Think Centre 71e)
|
|
2.
|
2nd
Generation Intel Core i3-2100 Processor with Intel 6 series
Chipset with Windows Starter Operating System*
Detailed specification as per Annexure II
|
28200/-
(Optiplex 790)
|
23500/-
(Infiniti MA 380)
|
28200/-
(HP Compaq 6200 Pro)
|
23500/-
(Veriton M200-H61)
|
25990/-
(Think Centre 71e)
|
|
3.
|
2nd
Generation Intel Core i5-2400 Processor with Q67 Chipset
(vPro Technology) with Windows 7 Prof. 64-bit Operating
System.
Detailed
specification as per Annexure III
|
37980/-
(Optiplex 990)
|
33000/-
(Infiniti MA 375)
|
HP
Compaq 8200 Elite Series
For
a single order:-
i) Upto 200 units @ Rs. 36450/-
ii ) 200 to 500 units @ Rs. 34500/-
iii) 500 to 2500 units @ Rs. 34000/-
iv) more than 2500 units @ Rs. 33000/-
|
33000/-
(Veriton M200-Q67)
|
35490/-
(Think Centre M91P)
|
*
This option is meant for School Education only to procure Windows7
Prof. upgrade and other Software under PIL Scheme of M/s Microsoft.
Note: Excise Duty/Custom Duty exemption
at actuals will be applicable for Education & Research Departments
having Excise Duty/Custom Duty exemption certificate under Government
of India Notification no. 10/97 and 51/96 etc.
OPTIONAL
ITEMS WITH COMPUTER SYSTEM
|
#
|
ITEM
|
DELL
MAKE
(M/s Electro Photo)
|
HCL
MAKE
(M/s HCL)
|
HP
MAKE
(M/s Spectra)
|
ACER
MAKE
(M/s ACER)
|
LENOVO
MAKE
(M/s Fore Solutions)
|
|
1.
|
Additional
2GB DDR-III RAM
|
1200.00
|
1200.00
|
1200.00
|
1200.00
|
1200.00
|
|
2.
|
Amplified
Speaker and Mike (OEM Make)
|
In-built
Speaker in CPU
|
In-built
Speaker in Monitor
|
250/-
|
250/-
|
In-built
in CPU
|
|
3.
|
Graphics
Card with 512 MB RAM
|
1800/-
|
1800/-
|
1800/-
|
1800/-
|
1800/-
|
RATE
CONTRACT OF COMPUTER SERVER VALID UPTO 31.04.2012
|
#
|
ITEM
|
UNIT
PRICE (Rs.)
|
MAKE
|
Vendor
|
|
1.
|
HP
ML 350 G6 Server
2 x Intel Xeon Quad Core E5606 Processor (2.13 GHz or higher)
with Intel 5520 or better Chipset
Detailed
specification as per Annexure IV
|
1,08,000.00
|
HP
|
HCL
Infosystems Limited
|
|
2.
|
Additional
16 GB ECC DDR-III RAM for Server in lieu of 8 GB RAM
|
13000.00
|
HP
OEM
|
HCL
Infosystems Limited
|
THE
VENDORS & MAKES EMPANELLED FOR COMPUTER SYSTEMS AT PRESENT ARE
AS FOLLOWS
|
SR.
NO.
|
VENDOR
|
MAKE
|
CONTACT
PERSON & PHONE
|
|
1.
|
M/s
Electro Photo Equipments Pvt. Ltd.
SCO 111-113, Sector - 17 B, Chandigarh
|
DELL
|
Mr.
Pawan Behal - 9814027744
Tel No: 0172-2721764, 3044123, 5087709, 5085862 FAX/Tel:2706895
mailto:pawanbehal@electrophoto.in,
electrophotolimited@gmail.com
|
|
2.
|
M/s
HCL Infosystems Limited
SCO 66-67, Sector -17 A, Chandigarh
|
HCL
|
Sh.
Om Jiwan Gupta - 9780011576
Sh. Sanjay Dewan - 9815008837
Ph. 0172-2709781
email:- omjiwang@hcl.com,
sanjay.dewan@hcl.com
|
|
3.
|
Spectra
Computech Pvt. Ltd.
SCO 2923-24, 2nd Floor, Sector - 22 C, Chandigarh
|
HP
|
Mr.
Sanjeev Sharma- 9872624240
Tel No: 0172-4305502, 4305500
ssharma@spectracomputech.com
Sandeep_vig@spectracomputech.com
|
|
4.
|
M/s
Acer India (P) Ltd.
SCO 58-59, 3rd Floor, Sector 34-A,
Chandigarh
|
Acer
|
Mr.
Pankaj Puri - 9814212468, 9316005162
Tel No.: 0172-3940870, 3029501-505,
Fax No. 0172-5003964
pankaj_puri@acer.co.in
|
|
5.
|
M/s
Fore Solutions Pvt. Ltd.,
SCO 319,2nd Floor, Sector 40-D, Chandigarh
|
Lenovo
|
0172-2691277,
5089166 Fax-2687365
fore@foresolutions.net
|
Annexure-I
Intel Core i3-2100 Processor with Intel 6 Series Chipset with Windows
7 Prof. OS
|
SPECIFICATIONS
|
|
ITEM
|
DESCRIPTION
|
|
Processor
Speed
Cache
System
Bus/QPI
Chipset
Mother
Board
Memory
Hard
disk Drive
Keyboard
Expansion
Slots
Housing
Video
Graphics
I/O
Interface
Ports
Power
Supply
Sound Card
OS
Supported
Storage
Bays
Mouse
Monitor
Optical
Drive
Ethernet
Card
Preloaded
Software
Certification
Other
items
|
Intel
Core i3-2100 or higher
3.10
GHz or Higher
3
MB Intel Smart Cache
5
GT/sec
Intel
6 series Chipset or better(Intel only)
Original
Intel or OEM manufactured
2
GB DDR-III RAM (1066 MHz) or higher
500
GB SATA (7200 RPM) or higher capacity
104
keys Standard keyboard
Minimum
1 PCI & 1 PCI Express x16 (Total 3 slots either of the
combination).
Micro
ATX Cabinet
Integrated
Graphics with Free slot for additional Graphics card
Dual
Channel serial ATA-150 controller
Minimum
6 USB Ports atleast 2 USB Ports at front side.
Suitable
power supply to meet the requirement of additional devices
(Power efficiency>=85%)
Integrated
Windows
XP/ Vista/Windows 7 / Linux
Minimum
two External 13.35cm (5.25") and one Internal 8.90
cm (3.5) or One External 13.35cm (5.25") &
one external 8.9 cm (3.5") bays and one Internal 8.90
cm (3.5) storage bays
Optical
mouse with Pad
18.5"
TFT (Wide Screen) or higher TCO 05 Certified
16X
Internal DVD Writer
10/100/1000
MBPS
Windows 7 Professional 32 bit with Media
Microsoft Security Essential Antivirus Software Preloaded
ISO 9001/9002, Energy star 5.0 Compliant, FCC, UL,CE
Set
of Dust Covers of good quality for the complete system
|
Annexure-II
Intel Core i3-2100 Processor with Intel 6 Series Chipset with Windows
Starter OS
|
SPECIFICATIONS
|
|
ITEM
|
DESCRIPTION
|
|
Processor
Speed
Cache
System
Bus/QPI
Chipset
Mother
Board
Memory
Hard
disk Drive
Keyboard
Expansion
Slots
Housing
Video
Graphics
I/O
Interface
Ports
Power
Supply
Sound Card
OS
Supported
Storage
Bays
Mouse
Monitor
Optical
Drive
Ethernet
Card
Preloaded
Software
Certification
Other
items
|
Intel
Core i3-2100 or higher
3.10
GHz or Higher
3
MB Intel Smart Cache
5
GT/sec
Intel
6 series Chipset or better(Intel only)
Original
Intel or OEM manufactured
2
GB DDR-III RAM (1066 MHz) or higher
500
GB SATA (7200 RPM) or higher capacity
104
keys Standard keyboard
Minimum
1 PCI & 1 PCI Express x16 (Total 3 slots either of the
combination).
Micro
ATX Cabinet
Integrated
Graphics with Free slot for additional Graphics card
Dual
Channel serial ATA-150 controller
Minimum
6 USB Ports atleast 2 USB Ports at front side.
Suitable
power supply to meet the requirement of additional devices
(Power efficiency>=85%)
Integrated
Windows
XP/ Vista/Windows 7 / Linux
Minimum
two External 13.35cm (5.25") and one Internal 8.90
cm (3.5) or One External 13.35cm (5.25") &
one external 8.9 cm (3.5") bays and one Internal 8.90
cm (3.5) storage bays
Optical
mouse with Pad
18.5"
TFT (Wide Screen) or higher TCO 05 Certified
16X
Internal DVD Writer
10/100/1000
MBPS
Windows Starter
Microsoft Security Essential Antivirus Software Preloaded
ISO 9001/9002, Energy star 5.0 Compliant, FCC, UL,CE
Set
of Dust Covers of good quality for the complete system
|
Annexure-III
Intel Core i5-2400 Processor with Q67 Chipset with Windows 7 Prof.
64-bit OS
|
SPECIFICATIONS
|
|
ITEM
|
DESCRIPTION
|
|
Processor
Speed
Cache
System
Bus/QPI
Chipset
Mother
Board
Memory
Hard
disk Drive
Keyboard
Expansion
Slots
Housing
Video
Graphics
I/O
Interface
Ports
Power
Supply
Sound Card
OS Supported
Storage
Bays
Mouse
Monitor
Optical
Drive
Ethernet
Card
Preloaded
Software
Certification
Other
items
|
Intel
Core i5-2400 or higher with v-Pro technology
3.1
GHz or Higher
6
MB Intel Smart Cache
5
GT/sec
Intel
Q67 series Chipset or better (Intel only)
Original
Intel or OEM manufactured
4
GB DDR-III RAM (1066 MHz) or higher RAM
500
GB SATA (7200 RPM) or higher capacity
104
keys Standard keyboard
Minimum
1 PCI & 1 PCI Express x16 (Total 3 slots either of the
combination).
Small
Form Factor (SFF) Cabinet with volume <=16 Liters
Integrated
Graphics with Free slot for additional Graphics card
Dual
Channel serial ATA-150 controller
Minimum
6 USB Port atleast 2 USB Ports at front side.
Suitable
power supply to meet the requirement of additional devices
(Power efficiency>=85%) with Active power factor Correction.
Integrated Internal Speaker on Motherboard/ TFT/ Headphone
(Creative / Logitech)
Windows
XP/ Vista/Windows 7 / Linux
Minimum
one External 13.35cm (5.25") & one Internal 8.90
cm (3.5")
Optical
mouse with Pad
18.5"
TFT (Wide Screen) or higher TCO 05 Certified
16X
Internal DVD Writer
10/100/1000
MBPS
Windows 7 Professional 64-bit with Media
Microsoft Security Essential Antivirus Software Preloaded
ISO
9001/9002, Energy star 5.0 Compliant, FCC, UL,CE
Set
of Dust Covers of good quality for the complete system
|
Annexure-IV
HP ML 350 G6 Server
|
SPECIFICATIONS
|
|
ITEM
|
DESCRIPTION
|
|
Processor
Speed
Cache
FSB
Chipset
Mother
Board
Memory
Hard
disk Drive
RAID
Bays
Keyboard
Expansion
Slots
Cabinet
Video
Graphics
Ports
Power
Supply
OS Supported
Mouse
Monitor
Optical
Drive
Ethernet
Card
Preloaded
Software
Certification
Warranty
|
2*
Intel Xeon Quad Core E5606 or higher
2.13
GHz or Higher XEON Quad Core
4
MB L3 Cache 800 MHz Qpi Bus
1333
MHz FSB or higher
Intel
5520 or better on Intel or Equivalent OEM
Original
Intel or OEM manufactured
8
GB ECC DDR-III RAM expandable upto 32 GB
4
x 300 GB 15K Hot-Swap 3.5" SAS HDD's/10K Hot Swap 2.5"
HDD
8
port SAS RAID Controller with 256 MB Cache (RAID 0,1,5 Support)
8 Hot Swap bays for HDDs
USB
104 keys Standard Keyboard
5
PCI/PCI Express
Tower
Integrated Graphics to support VGA and above resolution
4 USB & 1 Serial port
Redundant
power supply (Hot Swap) with Cooling option to meet the
requirement of additional devices
Window Server 2008/ Linux
Optical
mouse with Pad
18.5"
TFT (Wide Screen) TCO 03 Certification
16X
Internal DVD Writer
Dual
Gigabit LAN Card with asset, tracking feature and security
management, remote wake up
Server Management Software
ISO
9001/9002 , FCC, UL, Windows, Red hat
3
Years Comprehensive on-site
|
Mode
of Purchase:-
The Indenting Departments/Organizations shall be at liberty to either
place the orders through HARTRON or directly with the vendors at
the rate contracts recommended above. In case the orders are placed
through HARTRON, the Corporation would be responsible for inspections
and delivery and charge the agency charges, as applicable, over
and above the contracted prices. In case of direct orders, the HARTRON
agency charges would not be payable but the responsibility for inspections
and delivery would rest with the indenting Departments/Organizations.
In case where the Departments/Organizations decide to place the
orders through HARTRON during the period of rate contract, the MD
HARTRON would also seek the preference of brands/makes from HODs/Secretaries
of such indenting departments and place the orders accordingly.
Wherever, the indenting department did not indicate any preference,
the orders would be placed to the lowest bidder. Further, in case
of non supply of dust cover & mouse pad Rs. 125/- will be deducted
per computer from the R/C price.
Terms
and conditions:-
1. Price: The total F.O.R. destination prices mentioned in
Purchase Order are inclusive of current excise duty, freight, insurance,
Sales Tax etc. No change in any other duties, including Sales Tax,
Custom Duties, effect due to devaluation of Rupee shall be entertained.
2. Configuration: Systems matching the configuration
and sub assemblies (model and make) of the system offered for evaluation
will only be accepted for testing.
3. Service support: Supplier will depute a maintenance
and service support team with spare parts (at no cost of Govt.)
for each block of 100 computer/servers to provide prompt service
during the warranty period and AMC period, if awarded.
4. Pre-delivery inspection: Before taking delivery,
every system will be inspected and tested. Computer/server systems
will be subject to bench marking test (WIN bench/AMI-DIAGS) and
also continuous run test for a period of 24 hrs. These tests will
be carried out at vendor's premises at vendor's cost. It is a responsibility
of the vendor to make necessary testing facility available at his
place. The tested systems shall be sealed for delivery. Supplier
shall inform to HARTRON at least Seven days in advance for pre-inspection.
5. Identification Mark: Every system should have identification
mark and the identification mark No. will be provided by HARTRON
after the successful inspection of the respective product.
6. Packing: All goods should be packed properly to
avoid breakage and pilferage in transit.
7. Packing List: Packing list is to be provided with
the delivery challan.
8. Transit Insurance: The supplier has the responsibility
to get the transit insurance at his own cost.
9. Rejection: All goods to be supplied which are not
as per specification or are not of standard quality are liable to
be rejected and returned to you at your own risk and cost. In case
any of the material supplied by you is rejected and is lying stored
with us, the same shall be at your own risk.
10. Payment Terms: For empanelled vendors with HARTRON
from the last 5 or more financial years continuously and rated satisfactory
for after sale service and delivery period, the payment terms would
be 95% after inspection (wherever applicable) and delivery, balance
5% payment within one month from the date of installation by obtaining
one time performance security of Rs. 5.00 lacs in addition to Rs.
2.50 lacs as EMD upto the order value of Rs. 2.50 Crores. For remaining
vendors payment terms will be 90% on inspection and delivery. Balance
10% payment will be made after satisfactory installation and on
submission of 10% bank guarantee valid for a period of 37 months
(warranty period + one month) + the period of AMC to the extent
availed. Bank guarantee shall be retained by HARTRON. 10% Bank Guarantee
will be released after completion of period of warranty and the
period of AMC, as applicable. In case user Department does not opt
for AMC, bank guarantee will be released after completion of warranty
period of three years. Bank Guarantee to be obtained for order value
of more than Rs. 3 Lac.
11. Preventive Maintenance:- The vendor will visit
the computer installation site at least once in a year for preventive
maintenance (cleaning etc.) during warranty & AMC period even
if no complaint lodged by the purchaser/user department. The Bank
Guarantee of 10% of total order value submitted by Computer vendors
for a period of 37 months will be released by HARTRON only after
verifying adherence to the preventive maintenance reports and call
reports in respect of the Computer Systems supplied. The purchasing
Departments/organizations shall maintain logs/registers wherein
the service visits (both preventive and call services) would be
recorded. HARTRON would issue detailed guidelines on the subject
to the purchasing Departments/ Organizations.
12. Delivery Period: The delivery period would be
8 weeks and 1 week for inspection for Computers & maximum 10
weeks for Server.
13. Penalty Clause: After expiry of delivery period,
a penalty @ 0.5% per week for the delay of first two week and 1%
penalty for the delay of next 3 weeks upto a maximum cap of 4% penalty
for 5 weeks delay. Thereafter, HARTRON may cancel the order in consultation
with Indenting Department/ Organization and suitable action may
be taken against the defaulter firm. However, in case purchasing
Departments/Organizaitons opts for accepting the Computer/Servers
beyond 5 weeks delay, then 1% penalty would be continued for unjustified
delay.
14. Risk Purchase: On the failure of the supplier
to make supply within the extended period or otherwise on the receipt
of such information in the office of HARTRON, risk purchase at the
cost of supplier will be made by HARTRON within 6 months of the
expiry of the stipulated delivery period by inviting short term
quotations from the registered and other known suppliers. The excess
cost thus incurred will be recovered from the supplier from his
pending bills/earnest money or through court of law.
15. Undertaking of Rates:- All the three vendors have
given an undertaking that the rates offered to GoH/ HARTRON were
the lowest possible for this purchase of Computers and Rate Contract
for a period of 6 months. They have confirmed that they had not
offered these rates or lower rates to any other Govt. Departments/
Organizations. However, in case, it is established that they or
their principal has offered lower rates through any dealer for similar
model and quantity, terms and during the same period, they would
be liable to pay the differential amount to HARTRON. .
16. Warranty Period: The warranty of complete system, including
software support, would be 3 years from the date of installation.
Warranty will cover repair/replacement of all defective parts, if
any, with the same or equivalent make for any part replaced. Software
media will not be covered under warranty period, but it will be
replaced by the supplier against any manufacturing defects. The
maintenance of systems supplied will be provided on site. Limited/
carry-in warranty will not be accepted. The supplier will provide
after-sale service during the warranty period from Chandigarh or
from the nearest place of installation site. The supplier will complete
the service call within one working day for Chandigarh/Panchkula,
within two working days for other District Headquarters and within
3 working days for the remaining locations, failing which, penalty
shall be levied @ 1% per working day for totally down system and
@ 0.5% per working day for partially down systems of the annual
warranty amount. The annual warranty amount shall be deemed to be
@ 10% of the initial cost price.
17 . Cancellation of order:
(a) If the order is not executed, as specified there in or in accordance
with the written delivery schedule furnished by us, for satisfactory
performance of this order, we reserve the right to cancel this order,
without liability.
(b) Any loss incurred for non-execution of this order, will have
to be borne by you and the same shall be recovered from you.
18. Acceptance Certificate: On successful commissioning,
indenting organizations will issue an acceptance certificate.
19. Responsibilities: It will be responsibility of
the vendor to keep the system in good working condition so as to
ensure a minimum of 95% uptime on monthly basis by carrying out
the necessary repairs/maintenance of computer/server systems otherwise
it will be treated as a non-performance, on part of the vendor for
which performance guarantee may be forfeited and may be debarred
for future business. The vendor shall provide free replacements
of equivalent parts as and when required, excluding printer ribbons,
toners, tapes and floppy media. Warranty period shall be applicable
from the date of successful installation.
20. Installation:
(a) The vendor will install the complete system (hardware and software)
at the premises decided by HARTRON 220V +/-10% AC source; 50 Hz
+/- 1Hz shall be made available at site by the user.
(b) The wiring diagrams and panels required for the system installation
shall be given by the vendor in advance. User Department/Organization
shall make available the necessary wiring and panels at the installation
site.
(c) Full details of space requirement with dimensions should be
given in advance.
(d) Also specify other details, which are essential/necessary for
computer/server functioning.
21. Training: The vendor shall provide operational
training on the operating system and other related software purchased.
22. Documentation: Documentation of system software,
library routines etc. must be provided along with the detailed operating
instructions. The documents supplied must be neat, concise and readable.
They should be original, licensed copies. The documentation of the
hardware should also be provided which covers the maping and other
tunable parameters.
23. Reinstallation: If the need arises the computer/server
supplier shall reinstall the said computer/server system at a new
site without any additional charges. The agreement shall stand valid
for 5 years. However, packing forwarding and insurance charges for
shifting the system at new site will be borne by the user organization.
24. AMC Period: The Annual Maintenance Contract (AMC)
beyond the warranty period of three years is at the sole discretion
of the purchasing department, which may be availed for a maximum
period of up to 3 years after the warranty period. Wherever, the
purchasing department wishes to avail of the AMC for whatever period
(subject to a max. of 3 years), the same would be available @5%
of the total hardware cost. AMC will cover all parts except software
media. Service clause for the AMC shall be similar to warranty conditions.
Penalty shall be levied @1% per working day for totally down system
and @0.5% per working day for partly down system of the AMC amount.
The penalty amount will not exceed the total AMC amount.
25. Details of after-sale support and response time.
(a) M/s HCL have accepted that minimum two company engineers at
each districts will be appointed to take care of after sale-support.
Response time for district Head Quarter would be the same business
day closer and outstation beyond city limits as the next business
day closer. In addition, the list of their direct support offices
across the state along with escalation matrix placed at Annexure-A.
(b) M/s Dell will provide services directly through their service
provider after call is registered at their call center on phone/e-mail
and diagnoses is done on-line same time. The engineer will visit
next business day with parts The support & escalation matrix
is placed at Annexure-B. M/s Electro Photo has accepted that they have
service coordinator at Hisar, Gurgaon, Rohtak, Karnal,Panchkula
and Chandigarh for helping customers get Dell Support.
(c)M/s HP India, through M/s Spectra Computech have accepted that
response time of 6 hours is applicable in case of systems installed
within 30 kms of support centers (at Gurgaon, Karnal, Panipat, Ambala,
Hisar, Faridabad, Rohtak & Kurukshetra) and the next business
day for all other places. The list of service centers along with
escalation matrix placed at Annexure-C.
26. Billing:
(a) With every dispatch of goods or materials under the contract,
invoices in triplicate will be prepared by the contractor. Invoices
in duplicate are to be sent by the contractor to the indenting department,
the duplicate to be returned by the indenting department with the
quantities or number received duly noted thereon and the third copy
to be sent by the contractor to Asstt. General Manager (Mkt.), HARTRON
for record in his office.
(b) The bill /Challan should clearly mention our purchase order
no. & date, dispatch particulars & date, description of
stores which should be in accordance with the description given
in the purchase order, item no., reference, as given in the P.O.
etc.
(c) In case material is to be sent by Road, 2 copies of the invoices
must be sent through the carriers for purpose of octroi check and
for checking by sales tax authorities.
(d) Advance copy of Challan & Invoice must be sent directly
to consignee.
(e) Each item should bear identification mark i.e. purchase order
no. & S.no.
27. Location: Location of installation of each department
where the systems are to be installed will be provided by HARTRON
at the time of inspection.
28. Alternative Models: It might happen during the
Rate Contract period that existing processor may not be available
due phasing out of production by the manufacturer-suppliers. In
such a situation, the supplier would supply the upgrade model at
the same or lesser price. MD, HARTRON would be competent to accept
higher models at the same or lesser price during the Rate Contract
period.
29. Arbitration Clause: In the eventuality of any dispute,
the sole arbitrator shall be Commissioner, Information Technology,
(CIT), Haryana and his decision shall be binding on the concerned
parties.
30. Augmentation: The supplier shall have to guarantee
for a minimum period of 5 years from the date of acceptance that
the system shall be upgraded to the latest version or some additional
systems at their negotiated prices. (if any).
31. Jurisdiction: All disputes will be settled within
the jurisdiction of Chandigarh.
|